🔌 PLN UP3 Muara Bungo
🔌 EV chargers
PLN UP3 Muara Bungo, , Kabupaten Bungo, Jambi
🧭 Directions| Operator | PLN (Indonesia) |
|---|
🔌 EV charging details
| Connectors | 2 × CCS (Type 2) – 120 kW (DC) 1 × Type 2 (Tethered Connector) – 7 kW (AC) |
|---|---|
| Charging bays | 1 |
| Operator | PLN (Indonesia) |
| Cost | IDR 2467/kWh ++ |
| Status | Operational |
| Access | Public |
| Last updated | 2026-04-22 |
EV details from Open Charge Map. EV data © Open Charge Map contributors, CC BY 4.0. Check with the operator before you travel.