🔌 Rest. El Valle Grande
🔌 EV chargers
Carretera de Cáceres a Badajoz, Puebla de Obando, Extremadura
🧭 Directions| Operator | TotalEnergies (ES) |
|---|
🔌 EV charging details
| Connectors | 2 × CCS (Type 2) – 100 kW (DC) 1 × CHAdeMO – 50 kW (DC) 1 × Type 2 (Socket Only) – 22 kW (AC) |
|---|---|
| Charging bays | 2 |
| Operator | TotalEnergies (ES) |
| Cost | 0,50€/kWh >60kW - 0,39€/kWh 50kW - 0,32€/kWh AC |
| Status | Operational |
| Access | Public - Membership Required |
| Last updated | 2025-04-30 |
EV details from Open Charge Map. EV data © Open Charge Map contributors, CC BY 4.0. Check with the operator before you travel.